Falcon 900EX EASy Winglets
Winglet technology helps boost performance and fuel savings for the Falcon 900 series business aircraft.
The winglets and winglet installation kits are purchased by the operator directly from API. The winglets and associated components will be installed using OEM wing tooling.
The end result is an aircraft with increased range (as specified on the API website, an estimated 5% increase for operators cruising at Mach .80 and over 7% at Long Range Cruise*). It also includes an exclusive LED anti-collision/navigation light system for greater reliability.
*See API website www.aviationpartners.com for specific details.
Benefits
- Increased aircraft efficiency
- Faster climb to altitude
- Increased range
- Installation with Dassault OEM tooling
- Interchangeability of modified components supported by Worldwide Spares
- FAA / EASA approval through API STC
Estimated Downtime
Preparation Lead Time: 4 Weeks
Installation Time: 10 Weeks
The above lead time and downtime are general estimates only. Please contact your Dassault Falcon Jet Service Center Regional Sales Manager for schedule and lead time of the total project on your aircraft.